Reconstruction of a lead refinery RMHK ” Trepca ” in Zvecane
The building of new refineries lead RMHK ” Trepca ” in Zvecane was completed in 1982. years , but was never put into operation because of an over capacity , and the plant continued to use the old refineries were built before World War II . However, as it did not meet environmental standards , access to reconstruction and modernization of the recent operation , which after 25 years spent outside of the tool was in poor condition . It is necessary to present significant construction work on the reconstruction of the facility and associated infrastructure , put the chimney tunnel function ( to pump water and to rehabilitate Fireclay lining of the tunnel ), and generally modernize the plant and adapt it to the environmental standards of the human environment .
The main work was done on the project are :
• Reconstruction of the Kazan plant parts
• Reconstruction of ingot casting machine
• Apparatus for removing oxide dust and foam
• Reconstruction of cranes
• Automation system charging lead
• Reconstruction of gas cleaning
• Reconstruction of the cooler gases P = 600 m2
• Reconstruction of the fan DN -3 , P = 250kW
• Reconstruction of the fan V = 60,000 m3 / h
• Development of two pumps for gas stations with the installation of seasonal reservoirs